Dearneside Fabrications are pleased to announce they have been awarded the Balcony and Architectural Metalwork package on the Phase 2 at Embassy Gardens, London.
The company has been onsite for the previous 2 years delivering over £3 million of Balconies /Architectural Metalwork on Blocks A10 & A11 on Phase 1.
Additional Project Details:-
Heralded as London’s new diplomatic precinct, Embassy Gardens will reflect this with its use of stylish design and craftsmanship. The design style is distinctive, with the red-brick exteriors inspired by the historic meatpacking districts of New York, and with influences of London’s historic Victorian and Edwardian mansion blocks.
Comprising 179 suites, one, two, three bed apartments and a stunning penthouse, the release of the second phase offers potential purchasers the opportunity to buy in one of London’s most exciting residential schemes. The pinnacle of the development is the Sky Pool, a stunning suspended swimming pool which links two buildings at the tenth storey – the first of its kind in the world. Entirely transparent and structure-free, the pool will allow residents to swim from one building to the other – a 35m high aqua bridge in the sky.